How to Swimming pool?
Its all using form now and will not be well before the project is completed. Just what has actually occurred over the past a couple of weeks -
- All the external windows come in
- Flooring tend to be down, insulating completed & screeding started
- New ceilings inside switching spaces fitted
- New bulkhead installed
- Air ducting for switching spaces set up
- All wall space whitewashed
- Very first fix electrical work completed
- Very first fix Air Con completed
- Curb for road and ramp fitted
- Exterior rendering begun
- New reception counter under building
- Internal plumbing system complete.
Keep checking back for the following revision and photos!
Day 196...
New Changing Rooms -
The floor coverings has been laid
The reception counter is set up
All walls done
Toilets & Cubicles fitted
Basins becoming installed
Changing cubicles fitted & duck panels
Lights installed
Vanity products in.
Gym -
Plumbing & Electrics fitted
Smart Card detector installed
Office display fitted
Painting & Tiling starting a few weeks
Air-Conditioning set up
Outside/Vending Area/Plant Place Works -
Ramps becoming filled for levelling and completing in a few days
New flooring for vending area becoming fitted next week
RELATED VIDEO
Share this Post
Related posts
Electric Showers
If you know how it feels to put up with the odd shower that does not hold a stable temperature and makes you slouch miserably…
Read MorePool Maintenance Tips
Pretty soon swimming pool holders will face the annual problem: opening a backyard swimming pool for the summer period. The…
Read More